Project Overview
In the fall of 2019, IMBA Trail Solutions purchased a 48’x4’ Areté Structures truss style bridge. The bridge was installed in Hot Springs Arkansas on a trail in Cedar Glades Park.
FRP Bridge Design:
- FRP Trussed Bridge Design
- Bridge Span 48’ x 4’
- Straight ends
- 42” high railings
- Dead load camber design
- Standard color: Olive Green
- Standard hot dipped galvanized hardware
- Aluminum angle mounting clips (for abutment attachment)
- Pressure Treated Southern Yellow Pine wood decking


