PROJECT

Bicycle/Pedestrian Bridge in Hot Springs Arkansas

Project Overview

In the fall of 2019, IMBA Trail Solutions purchased a 48’x4’ Areté Structures truss style bridge.  The bridge was installed in Hot Springs Arkansas on a trail in Cedar Glades Park. 

Design

FRP Bridge Design:

  • FRP Trussed Bridge Design
  • Bridge Span 48’ x 4’
  • Straight ends
  • 42” high railings
  • Dead load camber design
  • Standard color: Olive Green
  • Standard hot dipped galvanized hardware 
  • Aluminum angle mounting clips (for abutment attachment)
  • Pressure Treated Southern Yellow Pine wood decking