PROJECT

60’ FRP Bridge for Chattahoochee River National Recreation Area

Areté Structures was contracted to supply a 60 foot by 5-foot FRP truss bridge for the Chattahoochee River National Recreation Area in Georgia. This olive-green bridge with timber decking and sloped end sections was installed by Link Welding Services of Cornelia Georgia. The bridge is located on the Bowmans Island Trail, which is a short out and back hike along the river with a scenic view of the forest.

Client

National Park Service

Location

Bowmans Island Trail

Categories

Scope of Work

60’x5’ FRP Truss Bridge